ダウンロード

マニュアル、データシート、ソフトウェアなどのダウンロード:

ダウンロード・タイプ
型名またはキーワード

フィードバック

When should I run SPC?

質問:

When should I run SPC?

回答:

Signal Path Compensation (SPC) can be run at any time. The best times to run SPC are:

  • After the oscilloscope has been powered on and has warmed up for 20 minutes or more.
  • If the temperature has changed more than 5 degrees C since the last SPC was run.
  • Prior to making a critical measurement.

FAQ ID 60156

すべてのFAQを表示 »