Question :
When should I run SPC?
Réponses :
Signal Path Compensation (SPC) can be run at any time. The best times to run SPC are:
- After the oscilloscope has been powered on and has warmed up for 20 minutes or more.
- If the temperature has changed more than 5 degrees C since the last SPC was run.
- Prior to making a critical measurement.
Cette FAQ concerne :
Série du produit : DPO7000 Oscilloscopes au phosphore numérique et à signaux mixtes MSO/DPO70000DX MSO3000/DPO3000 Oscilloscope à signaux mixtes MSO4000/DPO4000 Oscilloscope à signaux mixtes MSO/DPO2000B
Produit :
Numéro de la FAQ 60156
Afficher toutes les FAQ »