Download

Download Manuals, Datasheets, Software and more:

DOWNLOAD TYPE
MODEL or KEYWORD

Feedback

When should I run SPC?

Question :

When should I run SPC?

Answer :

Signal Path Compensation (SPC) can be run at any time. The best times to run SPC are:

  • After the oscilloscope has been powered on and has warmed up for 20 minutes or more.
  • If the temperature has changed more than 5 degrees C since the last SPC was run.
  • Prior to making a critical measurement.

FAQ ID 60156

View all FAQs »