Question :
When should I run SPC?
Answer :
Signal Path Compensation (SPC) can be run at any time. The best times to run SPC are:
- After the oscilloscope has been powered on and has warmed up for 20 minutes or more.
- If the temperature has changed more than 5 degrees C since the last SPC was run.
- Prior to making a critical measurement.
This FAQ Applies to:
Product Series: DPO7000 MSO/DPO70000DX Mixed Signal/Digital Phosphor Oscilloscopes MSO3000 / DPO3000 MSO/DPO4000 Mixed Signal Oscilloscope (Discontinued) MSO/DPO5000B Mixed Signal Oscilloscope (Discontinued)
Product:
FAQ ID 60156
View all FAQs »