질문:
When should I run SPC?
답변:
Signal Path Compensation (SPC) can be run at any time. The best times to run SPC are:
- After the oscilloscope has been powered on and has warmed up for 20 minutes or more.
- If the temperature has changed more than 5 degrees C since the last SPC was run.
- Prior to making a critical measurement.
이 FAQ는 다음에 적용 됩니다:
제품 시리즈: DPO7000 MSO/DPO70000DX 혼합 신호/디지털 포스퍼 오실로스코프 MSO3000/DPO3000 MSO4000/DPO4000 MSO/DPO5000B 혼합 신호 오실로스코프
제품:
FAQ ID 60156
모든 FAQ 보기 »